{
  "title": "Quebec Bridge: dated events from the contract of 1903 to the completed bridge of about 1917",
  "description": "Dated events from the 1908 report (contract, approvals, shop work, erection, the warning of 27 August 1907, the telegram and the collapse of 29 August 1907, the commission and the two reports), with two later dates taken from photograph records. One row per event with the precision of its date; the qualifier column carries times as printed and the report's own inconsistencies, such as the telegram printed under an earlier date.",
  "license": "CC BY 4.0",
  "license_url": "https://creativecommons.org/licenses/by/4.0/",
  "creator": "From the Surviving Record",
  "page": "https://fromthesurvivingrecord.com/failures/quebec-bridge/",
  "derived_from": [
    "Royal Commission, Quebec Bridge Inquiry, Report, with C. C. Schneider, Report on Design of Quebec Bridge (Sessional Paper No. 154, Ottawa, 1908), pages named in each row or label",
    "A. A. Chesterfield, photograph, Library and Archives Canada C-003623 (record date)",
    "Wm. Notman & Son, photograph, McCord Stewart Museum VIEW-6190.1 (record date)"
  ],
  "method": "Compiled by From the Surviving Record from the data listed",
  "data_credit": [
    "Royal Commission, Quebec Bridge Inquiry, Report, with C. C. Schneider, Report on Design of Quebec Bridge (Sessional Paper No. 154, Ottawa, 1908), retrieved 2026-11-01, public domain",
    "A. A. Chesterfield, photograph of the Quebec Bridge centre span, 1916, Library and Archives Canada C-003623 (date from its archive record), retrieved 2026-11-01, CC BY 2.0",
    "Wm. Notman & Son, photograph of the Quebec Bridge, about 1917, McCord Stewart Museum VIEW-6190.1 (date from its museum record), retrieved 2026-11-01, public domain"
  ]
}
